More activity on the site this morning. At 10:30 the “concrete pumping” truck was loaded up by mixing trucks and the concrete started to flow into the wooden foundation frames. In the fourth photo below, there is a worker on the left who has the remote controls around his waist – aiming the long arm of the pumper to where the other workers are spreading the concrete. The fifth photo is a close up of one of the propane (?) heating machines that will be placed near the tarped concrete when the pumping truck is done – keeping the concrete warm as it dries. Also see below for short video of the action. [showhide type=”post”]
Want to keep up to date on the most recent construction activity? Sign up today and receive alerts directly to your email when new blog entries are made.